Skip to main content

Five sectors, one way in.

Talk about your project Sign in
Projects

Search for a project

By sector, country, type, state, budget range and keywords.

In whole units of the chosen currency, without separators. A range covers one currency only.

Required as soon as either budget bound is filled in.

Keywords match the project's reference and the fields specific to its type. Titles and descriptions are not covered yet. To search published titles, use the projects list.

9 project(s)

  • Finished

    Mobile concrete plant — refurbishment sites, Grand Est

    Project finished: 14,200 m³ produced over fourteen months against 12,000 planned, distributions paid.

    Reference : PRJ-2026-CE5D2CA2

    Created on : Aug 24, 2026

    Open the record
  • Suspended

    Sound post-production studio — Île-de-France

    Two dubbing theatres and a mixing room, halted after the chosen premises fell through.

    Reference : PRJ-2026-9AC6CA8C

    Created on : Aug 24, 2026

    Open the record
  • Raising funds

    Drought-tolerant barley — three seasons of trials

    Twelve varieties compared across four sites and three seasons, with the results published whatever they say.

    Reference : PRJ-2026-F18B70B6

    Created on : Aug 24, 2026

    Open the record
  • Under way

    Le Chant des ateliers — création chorégraphique, Constantine

    Neuf interprètes, six semaines de répétition et une première prévue en mars, dans les anciens ateliers ferroviaires.

    Reference : PRJ-2026-6FA42754

    Created on : Aug 24, 2026

    Open the record
  • Under way

    IT equipment refurbishment workshop — Algiers

    Four months in operation, 2,100 machines refurbished and a twelve-month warranty that holds.

    Reference : PRJ-2026-60F4C20C

    Created on : Aug 24, 2026

    Open the record
  • Not started

    6,000 m² logistics platform — Blida

    Temperature-controlled warehouse and twelve loading bays, funded and ready to start in spring.

    Reference : PRJ-2026-8EE07BC0

    Created on : Aug 24, 2026

    Open the record
  • Raising funds

    Industrial tomato cannery — Biskra

    A 40-tonne-a-day plant, backed by 180 hectares already contracted with eleven farms.

    Reference : PRJ-2026-0CC60ECE

    Created on : Aug 24, 2026

    Open the record
Let's talk
projects